Out of 79 votes for key issues voted on by the CUSD Board between 2011 and 2018, there were zero dissenting votes.
Not once was a single dissenting vote cast on any Measure S spending.
Date | Cost | Vendor | Vote | Description |
---|---|---|---|---|
2050 | Measure M would mature - $194M in debt | |||
2047 | Measure S matures - $94M in current debt, will be $132M total | |||
2021 | Measure K matures. Currently over $8m of principal and interest outstanding on a debt for Building C, which is now rotting and needs to be rebuilt at a cost of over $17M and counting | |||
2020-07-01 | Measure B Parcel tax ends - 11,045 taxable parcels at $150 each = 1,656,750 / year | |||
2019-06 | Very likely that CUSD voters will be asked to approve an increased parcel tax on the June 2019 ballot | |||
2018-06-05 | Election Day - mail in ballots must be postmarked by Election Day | |||
2018-04-14 | 5000 | Isom Advisors | Isom Advisors contributes $5,000 to Measure M campaign. CUSD signed $260,000 contract with Isom Advisors to serve as financial advisor for Measure S on 2012-02-29 | |
2018-04-12 | 3000 | Dannis Woliver Kelley | Dannis Woliver Kelley contributes $3,000 to Measure M campaign. CUSD signed $124,000 contract with Dannis Woliver Kelley to serve as bond counsel for Measure S on 2012-02-29 | |
2018-04-10 | 1000 | Atlas Pellizzari Electric | Atlas Pellizzari Electric contributes $1,000 to Measure M campaign. CUSD has spent $5.5M with Atlas Pellizzari Electric in six subcontracts. | |
2018-03-15 | Random alpha drawing, Measure M assigned to CUSD bond | |||
2018-03-14 | 63188221 | Grand Total Measure S Spent or Committed to Date | ||
2018-02-08 | 1329843 | Anderson Brule Architects | 5 - 0 | Approve Proposal for Design Cunha Building C Rehabilitation |
2018-02-08 | 5 - 0 | Adopt Resolution No. 02-18, Ordering a School Bond Election for June 5, 2018 and Authorizing Necessary Actions in Connection Therewith (REVISED) | ||
2017-12-14 | 509147 | CAW Architects, Inc | 5 - 0 | Approve of a Contract with CAW Architects, Inc. to Design Phase IV of Hatch Elementary School |
2017-11-09 | Blach construction | 4 - 0, Rob Pappalardo absent | Ratify Lease-Lease Back Agreement with Blach Construction | |
2017-11-09 | Dannis Woliver Kelley | Consent 4 - 0, Rob Pappalardo absent | Approve Proposed Agreement for Professional Services with the Law Firm of Dannis Woliver Kelley for the Consideration and Potential Calling for a Bond Election. | |
2017-11-09 | 12723 | Andreini Brothers | Consent 4 - 0, Rob Pappalardo absent | Approve 12,723 Change Orders/Additional Work for the Half Moon Bay High School Track Project |
2017-09-14 | Blach construction | 4 - 0, Kimberly Hines absent | Lease Lease Back Contract for Cunha C Building with no Gauranteed Maximum Price | |
2017-09-14 | 209623 | Andreini Brothers | Consent 4 - 0, Kimberly Hines absent | Approval of 209,622 of Change Orders/Additional Work for the Half Moon Bay High School Track Project |
2017-08-21 | Hatch 1-5 opens | |||
2017-08-10 | Adopt Resolution No. 16-17 Authorizing the Issuance and Sale of the 2017 General Obligation Refunding Issue up to $6m in bonds to refund certain maturities of Series A bonds to save up to 5.6% | |||
2017-06-22 | no price | Climatech LLC | 3 - 0, Kimberly Hines & Kirk Riemer absent | Conduct a Public Hearing and Adopt Resolution No. 16-17 for Award of the Energy Performance Contract to Climatec Lighting for Hatch, Cunha, King Mountain, and lighting and heating for HMB HS |
2017-06-22 | Dannis Woliver Kelley | Consent 3 - 0, Kimberly Hines & Kirk Riemer absent | Approve Dannis Woliver Kelley as legal counsel | |
2017-06-22 | Receive an Overview by TBWB Strategies and EMC Research on the Process to Assess the Feasibility to Pursue a General Obligation Bond | |||
2017-05-11 | Blach construction | 5-0 | Adopt Resolution No. 12-17 Supporting Award of Lease-Leaseback Agreements for Cunha C Building awarded based on 250 point system | |
2017-05-11 | 632260 | Cal Mult Award Schedules | 5-0 | Approve Agreement for Turf Installation at Half Moon Bay High School Track and Field |
2017-05-11 | 172746 | Anderson Brule Architects | 5-0 | Approve Contract with Anderson Brule Architects Inc for rhe Repair and Recontruction of Building C at Cunha |
2017-05-11 | TBWB Strategies | Consent 5-0 | Approve a Contract with TBWB Strategies to Assess the Feasibility to Pursue a Bond and Renewal of the Existing Parcel Tax | |
2017-05-11 | Discuss the Possibility of Serving Alcohol at District Owned Facilities | |||
2017-04-06 | 1868837 | Andreini Brothers | 5-0 | Approval to Award a Contract for Half Moon Bay High School Track and Field Contract |
2017-03-09 | 4 - 0 Rob Pappalardo absent | Adopt Resolution No. 06-17 for Best Value Methodology and Guidelines using 100 point system | ||
2017-03-03 | Thompson Builders | Half Moon Bay Review: CUSD files lawsuit against Thompson Builders | ||
2017-02 | 20,000,000 Series C Measure S bonds issued | |||
2017-02 | Cunha Gym and Pilarcitor High School open | |||
2017-01-19 | 14609722 | Blach construction | 5 - 0 | Approve Lease-Lease Back Agreement with Blach Construction for Cunha C Building Repairs, except for waterproofing repairs |
2017-01-01 | AB2316 requires governing boards formally advertise its Request for Proposal (RFP). | |||
2016-12-08 | 5 - 0 | Approve Intent of Lease-Lease Back Agreement with Black Construction | ||
2016-12-08 | 5 - 0 | Adopt Resolution No 22-16 Authorizing the Issuance of Series C Bonds Under the Measure S Facilities Bond Program | ||
2016-10-13 | 5 - 0 | Adopt Resolution No. 21-16 to Approve the use of the Lease-Leaseback Project Delivery Method and Negotiate Lease Agreements | ||
2016-09-08 | 12000 | 4 - 0 Michael Ahern absent | Approve the Installation of a Security System at Cunha | |
2016-09-08 | 975000 | 4 - 0 Michael Ahern absent | Approve Emergency Placement of Tempoary Portables at Cunha | |
2016-09-08 | Atkinson, Andelson, Loya, Ruud & Romo | Consent 4 - 0 Michael Ahern absent | Approve a Professional Services Agreement with the Law Firm of Atkinson, Andelson, Loya, Ruud and Romo for Special Education Legal Services | |
2016-07-05 | Half Moon Bay Review: "leaking problems ... started within weeks after the library and C building were occupied in early 2009 and cropped up again in affected rooms whenever there was significant rainfall." | |||
2016-06-23 | 19773645 | Blach construction | 4 - 0 Michael Ahern absent | Approve a Lease-Lease Back Contract for Construction of Hatch Phase II |
2016-06-23 | Dannis Woliver Kelley | 4 - 0 Michael Ahern absent | Approve Dannis Woliver Kelley as legal counsel | |
2016-06-02 | 4 - 0 Kirk Riemer absent | Adopt Addendum to the Half Moon Bay High School Track and Field Improvement Project Final Environmental Impact Report, State Clearinghouse @2015112016 | ||
2016-04-07 | LSA Associates | 4 - 0 Rob Pappalardo absent | Adopt Resolution No 05-16 Certifying the Finale Environmental Impact Report, Making the Required CEQA Findings, Approving the Mitigation monitoring and Reporting Pland and Approving the Project for the High School Track | |
2016-03-11 | Cunha Building C closed due to mold | |||
2016-03-10 | Consent 5 - 0 | Adopt Resolution No 03-16 to Approve the Prequalitifaction Process for Subcontractors for Lease-Leaseback Projects | ||
2015-12-01 | Half Moon Bay Review: “We are now officially a year late,” Yuster said when reached on Monday. | |||
2015-11-12 | 5261522 | Blach construction | 5 - 0 | Approve a Lease-Lease Back Contract for Pilarcitos |
2015-11-12 | 3000000 | Clark and Sullivan Builders | 5 - 0 | Approve a Lease-Lease Back Contract for Construction of the Cunha gym |
2015-09-10 | Panorama Education | Approve Contract Agreement with Panorama Education for LCAP surveys | ||
2015-09-10 | 22808 | Clark and Sullivan Builders | Approve Preliminary Service Agreement with Clark and Sullivan Builders, Inc for Cunha gym | |
2015-09-10 | Consent | Ratify the Site Lease with Blach Construction for Construction of Hatch | ||
2015-08-13 | Blach construction | Consent 5 - 0 | Ratify the Site Lease with Blach Construction for Construction of the Temporary Campus for Pilarcitos | |
2015-08-13 | 4837518 | Blach construction | 5 - 0 | Approve a Lease-Lease Back Contract for Construction of Hatch Phase I Construction Project |
2015-07 | State appellate court ruling against no bid Lease Lease Back contracts | |||
2015-07-15 | State issues stop work order for Pilarcitos portables | |||
2015-07-01 | Measure B Parcel Tax renews for another 5 years | |||
2015-06-18 | 498659 | Blach construction | 5 - 0 | Approve a Lease-Lease Back Contract for Construction of the Temporary Campus for Pilarcitos High School |
2015-06-18 | 5 - 0 | Approve Appointment of New District Superintendent and Approve Superintendent Contract Effective July 1, 2015 | ||
2015-06-18 | 333400 | Blach construction | 5 - 0 | Approve Preliminary Service Agreements with Blach Construction for Hatch and Pilarcitos |
2015-06-18 | Dannis Woliver Kelley | 5 - 0 | Approve Dannis Woliver Kelley as legal counsel | |
2015-06-04 | Half Moon Bay Review: School construction projects delayed Measure S projects running behind schedule | |||
2015-05-14 | Atkinson, Andelson, Loya, Ruud & Romo | Consent 4 - 0 Rob Pappalardo absent | Approve a Professional Services Agreement with the Law Firm of Atkinson, Andelson, Loya, Ruud and Romo for Special Education Legal Services | |
2015-05-14 | 93438 | LSA Associates | 4 - 0 Rob Pappalardo absent | Approve a Contract with LSA Associates, Inc. for CEQA Consulting Services for the HMB High School track |
2015-05-16 | Leadership Associates | 4 - 0 Kate Livingston absent | Approve a Contract with Leadership Associates to Conduct a Superintendent Search; Tony Roehrick resigned effective 2015-06-30 | |
2015-03-02 | Series B Cost of Issuance 160,000 total - Isom Advisors 66,768, Dannis Woliver Kelley 48,000 | |||
2015-03-02 | 5 - 0 | Adopt Resolution No 05-15 to Admen the Initial Study and Mitigated Negative Declartation and Mitigation Monitoring and Reporting Program for the Pilarcitos and Hatch Improvement Projects | ||
2015-03-02 | 5 - 0 | Approve the Scope of a Resolution Agreement with the US Department of Education, Office of Civil Rights Concerning Office of Civil Rights Case No 09-14-1373 | ||
2015-02-15 | Half Moon Bay Review: High school track project hits another hurdle Construction delayed to summer 2016 |
|||
2015-01-20 | 23554 | SSA Landscape Architects | 5 - 0 | Approve a Master Planning and Landscape Architectured Design Services Contract with SSA Landscape Architect, Inc. for the Farallon View Play Fields and Outdoor Learning Facilities |
2015-01-28 | 20,000,000 Series B Measure S bonds issued mature 2037 | |||
2014-12-11 | 5 - 0 | Adopt Resolution No 30-14 Approving the Initial Study and Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program for the Pilarcitos and Hatch Projects, and Authorizing the Filing of the Notice Determination | ||
2014-12-11 | 5 - 0 | Adopt Resolution No 29-14 Finding the Construction of a New Gymnasium at Cunha Intermediate School Exempt from the CEQA and Approving the Filing and Recordation of a Notice of Exemption | ||
2014-11-13 | 4 - 0 Kirk Riemer absent | Approve Prequalification Questionnaires end Evaluation Criteria for Lease-Lease Back Contractors and MEP Subcontractors | ||
2014-11-13 | 4 - 0 Kirk Riemer absent | Authorize the District to Release a Request for Qualifications for Lease-Lease Back Project Delivery Services | ||
2014-11-13 | 4 - 0 Kirk Riemer absent | Adopt Resolution No 25-14 Authorizing the Issuance of Series B Bonds Under the Measure S Facilities Bond Program | ||
2014-11-13 | Receive a Presentation from Dannis Woliver Kelley on Lease-Lease Back Project Delivery Method | |||
2014-10-09 | 53947 | LSA Associates | Approve Contracts with LSA Associates, Inc. for CEQA Consulting Services for Hatch, Pilarcitos, and the Cunha Gym | |
2014-09-25 | Half Moon Bay Review: Plan to remove trees on Cabrillo sites approved | |||
2014-09-18 | Receive a Tree Study Report and Discuss Recommendations from Kings Mountain Arbor Health and Safety | |||
2014-09-18 | 79274 | SSA Landscape Architects | 5 - 0 | Approve a Design Contract with SSA Landscape Architects, Inc for Additional Division of State Architects Required Elements for the HMB HS Football Field Turf Replacement Project |
2014-09-18 | 5 - 0 | Approve the Following Measure S Facility Bond Projects: Hatch, Pilarcitos, Cunha Gym, HMB HS Field and Track | ||
2014-08-14 | 365000 | WLC | 5 - 0 | Approve of a Contract with WLC Architects, Inc. to Design a Gymnasium at Cunha Intermediate School |
2014-06-26 | 5 - 0 | Approve Resolution No 13-14 Withdrawing Approval of the Half Moon Bay High School Track and Field Project, Withdrawing Project Notice of Exemption, and Rejecting Bids for Construction of the Project | ||
2014-06-26 | 5 - 0 | Approve Termination of Architectural Agreement for Convenience with DT Architecture, Inc for Design of a Dual Gymnasium at Cunha Intermediate School | ||
2014-06-14 | Half Moon Bay Review: Cabrillo withdraws track project after appeal | |||
2014-06-03 | Measure B passes 4,637 to 1,917 70.8% to 29.2% requires 66% | |||
2014-05-29 | 508388 | Opening Technologies | 5 - 0 | Approve Contract with Opening Technologies, Inc. to Complete the Safe School Initiative Upgrade |
2014-05-29 | FieldTurf USA | 5 - 0 | Approve Contract with FieldTurf USA, Inc. to Supply and Install a new Artificial Turf for the Half Moon Bay High School Sports Field | |
2014-05-29 | Andreini Brothers | 5 - 0 | Approve Contract with Andreini Brothers, Inc. to Provide Construction Renovation Services for the Half Moon Bay High School Sports Field | |
2014-05-29 | Dannis Woliver Kelley | Consent - 5 - 0 | Approve Dannis Woliver Kelley as legal counsel | |
2014-05-08 | 5 - 0 | Approve the Half Moon Bay High School Football and Track Improvement Project | ||
2014-04-15 | 234675 | DT Architecture | 5 - 0 | Approval of a Contract with DT Architecture, Inc. to Design a Dual Gymnasium at Cunha Intermediate School |
2014-03-06 | 5 - 0 | Approve Resolution No 06-14 to Establish the Amount and Term of a Parcel Tax Measure for the June 3, 2014 Ballot | ||
2014-02-11 | 237776 | WLC | 4 - 0 Rob Pappalardo absent | Approval of a Contract with WLC Architects, Inc. to Design the New Pilarcitos High School Campus |
2014-01-23 | Half Moon Bay Review: Cabrillo planning major track overhaul Upgrades to start in June | |||
2013-10-10 | 1753049 | WLC | 5 - 0 | Approve Contract with WLC Architects, Inc to Design a Modernization Project for Alvin S Hatch Elementary School |
2013-08-15 | Public Consulting Group | 5 - 0 | Approve the Selection of a Consultant to Provide Strategic Planning Services to the District | |
2013-08-15 | 5 - 0 | $90,931,253 district-wide facility master plan approved | ||
2013-08-15 | EMC Research | 5 - 0 | Approve a Contract with EMC Research to Provide Research and Consulting Services | |
2013-08-15 | TBWB Strategies | 5 - 0 | Approve a Contract with TBWB Strategies to Assess the Feasability to Pursue a Renewal of the Existing Parcel Tax | |
2013-07-23 | WLC | CUSD Facility Audit as part of the Master Plan | ||
2013-05-30 | 316167 | 5 - 0 | Repave HMB HS Parking Lot due to solar panels | |
2013-05-30 | Dannis Woliver Kelley | Consent - 5 - 0 | Approve Dannis Woliver Kelley as legal counsel (with increased rates) | |
2013-05-09 | 4000000 | 5 - 0 | Adopt District-wide Technology Implementation Plan | |
2013-05-09 | Resource Solution Group | 5 - 0 | Adopt Energy Management Plan | |
2013-02-12 | WLC | 5 - 0 | Ratify a Contract With WLC Architects, Inc. to Develop a District-Wide Facility Master Plan | |
2013-01-17 | 86500 | WLC | 4 - 0 Kirk Riemer absent | Approve a Contract With WLC Architects, Inc. to Develop a District-Wide Facility Master Plan |
2012-12-19 | 58000 | Made improvements to the durability of steel substructure that supports solar panels at Half Moon Bay High School and Cunha Intermediate School. | ||
2012-12-13 | 125000 | Resource Solution Group | 5 - 0 | Approve Contract with Resource Solution Group to Provide Energy Audit and Related Services |
2012-10-25 | Piper Jaffrey | 18,000,000 Series A Measure S bonds issued by Piper Jaffray | ||
2012-08-11 | Cunha field opens | |||
2012-06-02 | Measure S passes by 102 votes - 3,803 to 2,927 56.5% to 43.% requires 55% | |||
2012-05 | Piper Jaffrey | Piper Jaffrey contributes 20,000 to Measure S campaign | ||
2012-05 | Isom Advisors | Isom Advisors contributes 10,000 to Measure S campaign | ||
2012-05-31 | Tony Roehrick appointed Superintendent effective July 1 2012 | |||
2012-05-31 | Dannis Woliver Kelley | Consent - 5 - 0 | Approve Dannis Woliver Kelley as legal counsel (with increased rates) | |
2012-05-10 | Jones Hall | Consent - 5 - 0 | Approve contract with Jones Hall as Disclosure Counsel - no rates disclosed | |
2012-05-10 | Solar City | 5 - 0 | Approved Solar City contract | |
2012-05-10 | 810000 | Piper Jaffrey | Consent - 5 - 0 | CUSD signs 810,000 contract with Piper Jaffrey to issue Measure S bonds |
2012-04 | Dannis Woliver Kelley | Dannis Woliver Kelley contributes 7,500 to Measure S campaign | ||
2012-03-08 | 5 - 0 | CUSD puts Measure S on the June 2012 ballot. Rob Pappalardo says he and Freya McCamant will be co-chairing the campaign effort. John Moseley says solar power could save could save $325,000 annually. | ||
2012-02-29 | 260000 | Isom Advisors | CUSD signs 260,000 contract with Isom Advisors to serve as financial advisor for Measure S | |
2012-02-29 | 124000 | Dannis Woliver Kelley | CUSD signs 124,000 contract with Dannis Woliver Kelley to serve as bond counsel for Measure S | |
2012-02-29 | TBWB Strategies | CUSD signs contract with TBWB Strategies for general oversight advisement | ||
2012-02-29 | EMC Research | CUSD signs contract with EMC Research for community survey | ||
2012-01-12 | 5 - 0 | 700,000 Measure K for Cunha Field, total cost 2,500,000 | ||
2011-10-13 | Isom Advisors presents a no-cost, no-obligation report on current District bonding capacity from Greg Isom (Principal, Isom Advisors). District’s gross bonding capacity is $125.5 million (2.50% x assessed value); | |||
1996-06 | 35,000,000 Measure K passes, 25 year bond, expires 2021 |